Product Enhancements Since Alter NRG Purchased WPC
Since April 2007, Alter NRG has been augmenting the technical capabilities of WPC to allow the supply of a broader gasification system along with complementary engineering services that can be accessed by Energy Recovery from Waste project developers.
Below is a description of these services:
| Model | Benefit to Developer |
|---|---|
|
Gasification Plant Modeling |
|
|
GT Pro/PEACE |
|
|
CFD Modeling |
|
In 2007 Alter NRG upgraded the commercial demonstration facility at the WPC Plasma Center. Modifications included:
The project was completed in February 2008 and since then, Alter NRG has completed pilot tests to improve predictions for particulate carryover, fines recycle, O2 enriched operation, torch power control, and feed modifications.
As well, all the above plant upgrades and testing has led to an improved reactor design which is in the process of being patented.